New Features
Replies: 4
by
gregmcc »
Thu Apr 23, 2020 11:50 am
» in
Announcements
Hi everybody,
Just thought it was time for an update. We have over 160 members which is very good. Thank you for your support!
A few new features...
4 Replies
188984 Views
Last post by gregmcc
Thu Apr 23, 2020 12:23 pm
PEC Submain from Non M.E.N switchBoard
Replies: 1
by
Slovett »
Thu Nov 28, 2024 7:39 pm
Hi,
I've come across a non M.E.N distribution board that feeds a seperate M.E.N SwitchBoard.
ie. Main M.E.N Switch Board closest to the PoS --->...
1 Replies
642 Views
Last post by AlecK
Fri Nov 29, 2024 3:18 pm
Is main switchboard high risk
Replies: 6
by
Dan L »
Wed Jul 26, 2023 10:01 am
Rating: 22.22%
I was recently asked by electrician about Inspection requirements of a house built to be relocated (and installed permanently in unknown location)....
6 Replies
23767 Views
Last post by Dan L
Thu Jul 27, 2023 8:03 pm
AS/NZS 3000:2018 clause 2.10.2.2.2
Replies: 4
by
PeteRig »
Mon May 15, 2023 2:49 pm
First off, I know this standard is not cited but clause 2.10.2.2. has requirements for switchboards over 800A per phase or over 3m in length eg two...
4 Replies
15803 Views
Last post by PeteRig
Tue May 16, 2023 10:26 am
Large Switchboard in Container
Replies: 3
by
TPower »
Tue Jan 17, 2023 2:51 pm
I’ve had another electrician ask me about the use of a shipping container (that has exits at each end) to house a switchboard that has a 1000A/three...
3 Replies
18582 Views
Last post by jaimin.parmar
Mon Mar 06, 2023 8:52 am
Top or bottom feed
Replies: 1
by
GLion »
Wed Dec 07, 2022 3:50 pm
Rating: 11.11%
Hi,
I have a early 90's house, the busbars are on top of the MCB's hence I would call this a top feed installation. In modern installations, I see...
1 Replies
11401 Views
Last post by AlecK
Wed Dec 07, 2022 5:49 pm
Switchboard construction
Replies: 1
by
PeteRig »
Thu Aug 25, 2022 2:02 pm
Rating: 22.22%
Hi there, this question came up in a group I belong too:
When a switchboard is manufactured by a switchboard company, they have standards they...
1 Replies
11243 Views
Last post by AlecK
Mon Aug 29, 2022 11:00 am
0.6m access for domestic switchboards?
Replies: 2
by
JamieP »
Tue Jun 21, 2022 7:55 pm
Does 2.9.2.2 (I) apply to domestic switchboards? I understand the exception Exception: The requirements for doors of switchrooms and for emergency...
2 Replies
12897 Views
Last post by JamieP
Thu Jun 23, 2022 1:02 pm
First switchboard or metering point.
Replies: 14
by
Dan L »
Tue Sep 29, 2020 8:55 pm
Rating: 11.11%
Is it still OK to have a metering distribution point supplying seperate metered men switchboards.
For example a meter box with a neutral stud and...
14 Replies
42770 Views
Last post by AlecK
Sat Apr 02, 2022 5:29 pm
Number of Main Switches
Replies: 22
by
JamieP »
Fri Apr 17, 2020 8:58 pm
Rating: 22.22%
2.3.3.2 Number of main switches
The number of main switches shall be kept to the minimum practicable to
provide for effective operation in an...
22 Replies
108336 Views
Last post by AlecK
Fri Nov 26, 2021 1:22 pm
Restricted Locations - 2.9.2.5 (c)
Replies: 2
by
Slovett »
Thu Aug 05, 2021 8:21 pm
Rating: 22.22%
Hi,
I have a question about 2.9.2.5 (c). - Restricted Locations of Switchboards (Cupboards). - When does a cupboard turn into a room? Is there a...
2 Replies
14595 Views
Last post by Slovett
Sat Aug 07, 2021 6:57 pm
Submain configuration
Replies: 4
by
JamieP »
Tue May 04, 2021 2:47 pm
I have an existing submain coming from a MSB to a DB
What I have been asked to do is to extend this submain to another board, so having the 2,...
4 Replies
18179 Views
Last post by JamieP
Sat Jun 19, 2021 8:00 pm
4 Replies
30565 Views
Last post by PawPatrol
Mon Jun 14, 2021 1:02 pm
7 Replies
25103 Views
Last post by AlecK
Fri Jun 04, 2021 8:50 am
AS/NZS 3012/2019+A1 BTS SwitchBoards
Replies: 1
by
Slovett »
Thu May 27, 2021 1:16 pm
Rating: 22.22%
Hi,
Im just having a read through 3012:2019 to preempt some of the proposed changes coming for Domestic Construction SwitchBoards (BTS).
J3 (h) &...
1 Replies
10841 Views
Last post by AlecK
Thu May 27, 2021 2:26 pm
Meterbox as BTS
Replies: 4
by
Nathan »
Sat Apr 10, 2021 9:54 pm
I saw a house recently that had the meterbox set up as the BTS, Main earth to the meterbox, MEN link, neutral earth bars, 1 x MCB and 1 x double...
4 Replies
17602 Views
Last post by Dan L
Sun May 16, 2021 12:21 pm
Main switch readily accessible exception
Replies: 11
by
Dan L »
Sat Jun 27, 2020 8:05 pm
Rating: 11.11%
In regards to this question I have tried to find the answer in previous posts but have not found but if iv missed it I apologise.
Iv seen situations...
11 Replies
32758 Views
Last post by PawPatrol
Fri May 07, 2021 10:16 am
4 Replies
17021 Views
Last post by AlecK
Wed Dec 23, 2020 10:22 am
Can MEN link share terminals?
Replies: 3
by
Dan L »
Thu Dec 03, 2020 8:36 pm
On a commercial switchboard the MEN link (which was connected by lug not a screw type) was bolted onto the same stud as as another conductor on the...
3 Replies
15866 Views
Last post by Dan L
Fri Dec 04, 2020 11:02 pm
Main switch upgrade
Replies: 12
by
Dan L »
Thu Nov 26, 2020 10:11 pm
The hypothetical scenario is main switch upgrade.
1 phase site being upgrades to 3 phase site on old msb located above 2m. No change just extra...
12 Replies
34551 Views
Last post by Dan L
Thu Dec 03, 2020 8:11 pm
Control nigh rate main high risk
Replies: 4
by
Dan L »
Tue Dec 01, 2020 10:52 pm
Is a control nigh rate main high risk?
ESR say
mains means those fittings forming part of an installation that are used for the
supply of...
4 Replies
17100 Views
Last post by AlecK
Thu Dec 03, 2020 6:03 pm
Switchboards and additional enclosures
Replies: 5
by
JamieP »
Sun Nov 29, 2020 8:07 pm
At what point does a separate board or enclosure become a different switchboard or an enclosure that's not part of the associated switchboard
This...
5 Replies
19325 Views
Last post by AlecK
Wed Dec 02, 2020 9:53 am
Installing MCB at Meter board
Replies: 9
by
ElliotT »
Mon Jul 20, 2020 6:26 pm
Rating: 22.22%
Hi All,
I was at a house the other day and needed power outside for a fixed wire appliance (heatpump) the distribution board was in the center of a...
9 Replies
31495 Views
Last post by AlecK
Fri Nov 27, 2020 2:44 pm
Exposed parts near mcb and meter
Replies: 6
by
Dan L »
Wed Nov 04, 2020 9:27 pm
3.10.1.1.c
My understanding of this was if you need to enter an enclosure like a meter box to operate an mcb or fuse or read a meter (non smart...
6 Replies
21447 Views
Last post by Dan L
Fri Nov 06, 2020 8:21 pm
2 Replies
13327 Views
Last post by Dan L
Wed Sep 30, 2020 8:49 pm
2 Replies
13294 Views
Last post by Dan L
Mon Sep 14, 2020 3:49 pm
Forum permissions
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot post attachments in this forum