AS/NZS 3012/2019+A1 BTS SwitchBoards
Posted: Thu May 27, 2021 1:16 pm
Hi,
Im just having a read through 3012:2019 to preempt some of the proposed changes coming for Domestic Construction SwitchBoards (BTS).
J3 (h) & (i) are self explanatory (Board must be 1200mm from ground and fixed into position with 2 stays) BUT is the 3.0m pole (for underground mains) mandatory or a guideline only? (Table J1)
Thanks